Energy Recovery from Refinery Sludge Pilot Demonstration Project Provides fuel for Multi Hearth Municipal Sludge Furnaces for 5 Years
24 Hr Emergency Response
800-377-3648
10,000 Environmental Remediations Since 1975
Remtech © 2025
| CAREERS |
| Contact Us
Vacuum Truck Waste Transport
Supersacks Loaded on Flatbed
with Crane
Substation PCB Cabling Removal
for Incineration
Landfill Leachate Treatment System Design
Let Remtech manage your waste streams from cradle-to-grave that includes waste pickup, waste transport, and waste disposal. Each waste stream is classified and screened for waste minimization, recycling, treatment or disposal to minimize your liabilities and costs. Waste is transported and disposed of at approved facilities.
♻︎ Controlled & Clandestine Drug Lab Decon & Disposal - Many controlled substances and clandestine drug lab materials and wastes are highly reactive and require special handling. Remtech has worked with law enforcement and public health authorities to mitigate appropriately.
♻︎ Labpack Disposal - Characterization & packaging of laboratory and medical facility chemicals. Remtech handles waste streams from research, educational and medical facilities.
✓ Custom design/build wastewater & stormwater treatment systems
✓ Oil/water separators
✓ Solidification/chemical fixation
✓ Sludge dewatering systems
✓ Neutralization systems
✓ Chemical oxidization/reduction
✓ Biological treatment
✓ Physical/Chemical treatment
✓ Thermal treatment
✓ Landfill Leachate Treatment Maintenance and Cleaning
✓ Landfill Leachate Treatment System Design, Build
✓ Landfill Operation and Renewable Energy Recovery Optimization
✓ Renewable Energy System Design, Build, Operation
✓ Waste Characterization for Renewable Energy Recovery
✓ Wastewater Treatment Plant Sludge to Renewable Energy
✓ Landfill Gas to Renewable Natural Gas
✓ Agricultural Renewable Energy
✓ Composting Renewable Energy
✓ Biomass Renewable Energy
Energy Recovery from Refinery Sludge Pilot Demonstration Project Provides fuel for Multi Hearth Municipal Sludge Furnaces for 5 Years