Pollution Prevention and Secondary Containment
Remtech Engineers has over 30 years of experience in pollution prevention, secondary containment, and stormwater management systems. Remtech's expertise and tenure in the environmental services industry has allowed us to become a preferred environmental services company to a variety of clients.
Remtechβs experience gained from responding to over 9,000 incidents and determining root cause failures has made us exceptional loss prevention, pollution prevention, and system reliability design/construction professionals. Vulnerable operational and system failure elements are identified and failsafe solutions are incorporated into the design, construction and operation of pollution prevention and stormwater management systems. This maximizes system reliability and reduces life cycle accident and maintenance costs.
Pollution Prevention & Secondary Containment Systems
π· Loading Rack Secondary Containment Systems
π· Secondary Containment Basin Design and Construction
π· Secondary Containment Cleaning and Repair
π· Secondary Containment for Above Ground Storage Tanks
π· Secondary Containment for Oil Drums
π· Secondary Containment for Pipelines and Fuel Lines
π· Leak Detection and Control Systems
π· Stormwater Containment & Spill Pollution Prevention Systems
π· Soil & Groundwater Treatment Systems
π· Process Spill & Loss Prevention Systems
π· Stormwater & Wastewater Treatment Systems
π· Railcar and Tanker Loading, Unloading, and Containment Systems
π· Storm, Process, & Wastewater Sewer Installation
π· Oil/Water Separators
STORMWATER MANAGEMENT POLLUTION PREVENTION AND SECONDARY CONTAINMENT
β¦ Stormwater Sampling
β¦ Stormwater Pollution Prevention Plans
β¦ Stormwater Operation and Maintenance Plans
β¦ Stormwater Inspections (underwater drones)
β¦ Stormwater Maintenance
β¦ Stormwater Design and Operation
β¦ Underground Stormwater Drone Inspections
β¦ Detention and Retention Pond Emergency Containment Systems
β¦ Installation of Automated Sluice Gates for Stormwater Ponds
β¦ Detention and Retention Pond Outlet Controls
β¦ Pond Access Walkways and Stairways
β¦ Design, Fabrication, Instillation of Trash Racks
β¦ Pond Vegetation Maintenance and Control
β¦ Brush Hog Vegetation Mowing and Cutting of Steep Pond Banks
β¦ Vegetation Re-Establishment
β¦ Magnetic Drain Stops for Stormwater Drains
Automated Detention Pond Hydrocarbon Sensing and Closing System on Riser Pipe Installed at Power Substation
Debris Racks Installed in Stream Leading to 12 ft Diameter Stormsewer