Split Casing Secondary Containment Installed On Fuel Line Crossing Stream in Alabama
24 Hr Emergency Response
800-377-3648
10,000 Environmental Remediations Since 1975
Remtech © 2024
| CAREERS |
| Contact Us
Locations: Alabama, Kentucky, Missouri, North Carolina, Ohio, South Carolina, Virginia, West Virginia
Client: Major Railroad
Contract Amount: $1,560,000+
PROBLEM
Remtech was authorized by a major railroad to construct secondary containment and pollution prevention and control systems at railyards in eight states.
SOLUTION
Pollution prevention and secondary containment facilities constructed or installed by Remtech consisted of:
➣ Earth/Rock Containment and Contact Water Diversion Swales
➣ New Manholes & Connecting Piping
➣ Concrete Containment Dikes, Curbs & Headwalls
➣ Stormwater Containment Underflow Weirs with Automated Sluice Gates
➣ Footings and Columns for Overhead Fuel Pipe Bridges
➣ Split Casing Secondary Containment Piping
➣ Automated Fuel Control Valves with Leak Detection
➣ Hydrocarbon Sensors
➣ Control Valves & Pumps
➣ Protective Bollards & Access Grates
➣ Bank Stabilization & Erosion Control
➣ Protective Coatings
COST/BENEFITS
50,000 lb reinforced precast concrete underflow weir boxes and bases were fabricated at Remtech's facility in Atlanta and shipped up to 600 miles. The pre-fabricated boxes were lowered into excavations inside trench boxes. Fabrication of pre-cast structures was considerably less expensive than
forming and installing onsite.
Weir Box with Automated Gate and Hydrocarbon Sensor
Installed at St. Louis Yard
Automated Slide Gate Installed in Weir Box
Weir Box with Automated Gate Installed at South Carolina Yard
Construction of Road, Fuel Pipeline with Secondary
Containment & Supports, Curbing & Weir Box
Overhead Pipe Supports & Split Casing Installed at West Virginia Yard
Automated Fuel Valve with Leak Detection
Installed at Kansas City Yard
Hydrocarbon Sensor Installation in Weir Box
Pre-Cast 50,000 lb Weir Box Loaded from Remtech's Facility and Transported up to 600 Miles for Installation
Automated Sluice Gate, Hydrocarbon Sensor, & Control Box Installed in Weir Box
Split Casing Secondary Containment Installed On Fuel Line Crossing Stream in Alabama